Melhor Servidor Git e CI self-hosted
Um servidor doméstico para alojar código com Gitea, runners CI self-hosted mais Ansible e monitorização — o teu próprio GitHub.
Requisitos vs este build
necessário · usado| Núcleos de CPU | 7 | 44% | OK |
|---|---|---|---|
| RAM | 32 GB | 100% | Cheio |
| Armazenamento | 3.5 TB | 70% | OK |
| GPU | Não necessária |
Consumo
- Utilização
- 24/7
- Repouso
- 9 W
- Típico
- 16 W
- Pico
- 54 W
- Energia / ano
- ≈ €34
- Em 3 anos
- ≈ €103
Pontuação
Porquê esta variante
Balances your priorities with a 1053€ price tag and a 9W idle draw.
- Not specialized: it does not push any single dimension (value, silence, expansion) to the extreme.
- Getorli GT106 — AMD Ryzen 7 H 255: 16 threads, 32GB RAM, 8W idle — a complete, efficient prebuilt for this workload.
- Turnkey: no assembly, smaller footprint, lower energy than a custom build.
- Smart build — best all-round beats "Build yourself — for comparison" on efficiency +20, expandability -86, silence +40 — that is why it is recommended for your priorities.
Antes de comprar
Nada de crítico a corrigir antes de comprar.
- €579A procurar preços…
€474A procurar preços…
Pontuação de prova de futuro
Prova de futuro limitada31/100
Limited future-proofing (31/100) — expect to upgrade or rebuild sooner rather than later.
Prebuilt platform — the CPU/motherboard are not swappable in the usual sense, so the upgrade path is limited to RAM/storage/PCIe.
Expansion headroom: 0 PCIe slot(s), 0 M.2, 0 SATA, 0 drive bay(s), 0 RAM slot(s) free.
Storage is 70% utilized with 0 free drive bay(s) and 0 free SATA port(s).
0 RAM slot(s) free; memory is 100% utilized.
Networking is 2500 Mbps.
Prebuilt — proprietary parts can make replacement harder.
No GPU and little room to add one — demanding AI/transcoding workloads would be out of reach.
Homelab Risk Score
Risco moderado38/100
Moderate risk (38/100) — a few items are worth fixing before you commit (see checklist).
Auditoria final do build
Audit passed (0 critical, 0 warning) — mostly optional and future considerations remain.
O que se torna o limite
RAM is maxed out is the most likely thing to date this build within 1-2y.
O que o limita primeiro
RAM is the closest to its limit (100% of capacity in use) — it will likely force the next upgrade.
Missão
- Orçamento
- —
- Prioridade de energia
- 5/10
- Prioridade de ruído
- 3/10
- Prioridade de expansão
- 5/10
Arquitetura recomendada
prebuilt · mini system — AMD Ryzen 7 H 255- Computação
- —
- Memória
- —
- Armazenamento
- TEAMGROUP MP44 4TB M.2-2280 SSD PCIe 4.0 x4 NVMe
- Rede
- 1G onboard
- Arrefecimento
- —
- Fonte
- —
- Expansão
- Nada por agora — sem limites iminentes